Certain force acting on a 20 kg mass changes its velocity from 5 m s-1 to 2 m s-1. Calculate the work done by the force.
When the Velocity, v = 5 m/s
Mass, m = 20 kg
Then,
K.E. = mv2
= × 20 × (5) 2
= × 20 × 25
= 250 J
When the Velocity, v = 2 m/s
Mass, m = 20 kg
K.E. = mv2
= × 20 × (2) 2
= × 20 × 4
= 40 J
We know that,
Work done by force = Change in kinetic energy
= 250 - 40
= 210 J