Q8 of 17 Page 12

If a young man drives his scooter at a speed of 25 km/hr, he has to spend Rs2 per km on petrol. If he drives the scooter at a speed of 40 km/hour, it produces air pollution and increases his expenditure on petrol to Rs 5 per km. He has a maximum of Rs100 to spend on petrol and travel a maximum distance in one hour time with less pollution. Express this problem as an LPP and solve it graphically. What value do you find here?[CBSE 2013]

Let young man drives x km at a speed of 25 km/hr and y km at a speed of 40 km/hr. Clearly,


x, y 0


It is given that, he spends Rs 2 per km if he drives at a speed of 25 km/hr and Rs 5 per km if he drives at a speed of 40 km/hr. Therefore, money spent by him when he travelled x km and y km are Rs 2x and Rs 5y respectively.


It is given that he has a maximum of Rs 100 to spend.


Thus, 2x + 5y 100


Time spent by him when travelling with a speed of 25 km/hr = hr


Time spent by him when travelling with a speed of 40km/hr = hr


Also, the available time is 1 hour.



Or, 40x + 25y1000


The distance covered is Z = x + y which is to be maximized.


Thus, the mathematical formulation of the given linear programming problem is Max Z = x + y subject to


2x + 5y 100


40x + 25y1000


x, y 0


First we will convert inequations as follows:


2x + 5y = 100


40x + 25y = 1000


x = 0 and y = 0.


The region represented by 2x + 5y 100


The line 2x + 5y = 100 meets the coordinate axes at A(50,0) and B(0,20) respectively. By joining these points, we obtain the line 2x + 5y = 100. Clearly (0, 0) satisfies the 2x + 5y = 100. So, the region which contains the origin represents the solution set of the inequation 2x + 5y 100


The region represented by 40x + 25y 1000


The line 40x + 25y = 1000 meets the coordinate axes at C(25,0) and D(0,40) respectively. By joining these points, we obtain the line 2x + y = 12. Clearly (0, 0) satisfies the 40x + 25y = 1000. So, the region which contains the origin represents the solution set of the inequation 40x + 25y 1000


The region represented by x 0, y 0 :


Since every point in the first quadrant satisfies these inequations. So, the first quadrant is the region represented by the inequations x 0 and y 0.


The feasible region determined by the system of constraints


2x + 5y 100, 40x + 25y1000, x 0 and y 0 are as follows


1.jpg


The corner points are O(0,0), B(0,20), E, and C(25,0). The value of Z at these corner points are as follows:



The maximum value of Z is 30 which is attained at E.


Thus, the maximum distance travelled by the young man is 30 kms, if he drives km at a speed of 25 km/hr and km at a speed of 40 km/hr.

More from this chapter

All 17 →
6

A factory makes tennis rackets and cricket bats. A tennis racket takes 1.5 hours of machine time and 3 hours of craftman’s time in its making while a cricket bat takes 3 hour of machine time and 1 hour of craftman’s time. In a day, the factory has the availability of not more than 42 hours of machine time and 24 hours of craftsman’s time.

(i) What number of rackets and bats must be made if the factory is to work at full capacity?


(ii) If the profit on a racket and on a bat is Rs 20 and Rs 10 respectively, find the maximum profit of the factory when it works at full capacity. [CBSE 2011]

7

A manufacturer produces nuts and bolts. It takes 1 hour of work on machine A and 3 hours on machine B to produce a package of nuts. It takes 3 hours on machine A and 1 hour on machine B to produce a package of bolts. He earns a profit of Rs17.50 per package on nuts and Rs 7.00 per package on bolts. How many packages of each should be produced each day so as to maximise his profit, if he operates his machines for at the most 12 hours a day?[CBSE 2012]

9

A cottage industry manufactures pedestal lamps and wooden shades, each requiring the use of a grinding/cutting machine and a sprayer. It takes 2 hours on grinding/cutting machine and 3 hours on the sprayer to manufacture a pedestal lamp. It takes 1 hour on the grinding/cutting machine and 2 hours on the sprayer to manufacture a shade. On any day, the sprayer is available for at the most 20 hours and the grinding/cutting machine for at the most 12 hours. The profit from the sale of a lamp is Rs 5 and that from a shade is Rs 3. Assuming that the manufacturer can sell all the lamps and shades that he produces, how should he schedule his daily production in order to maximise his profit?[CBSE 2014]

10

One kind of cake requires 200g of flour and 25g of fat, and another kind of cake requires 100g of flour and 50g of fat. Find the maximum number of cakes which can be made from 5kg of flour and 1 kg of fat assuming that there is no shortage of the other ingredients used in making the cakes. [CBSE 2014, 2015]