Q12 of 20 Page 12

A factory manufactures two types of screws, A and B, each type requiring the use of two machines - an automatic and a hand - operated. It takes 4 minute on the automatic and 6 minutes on the hand - operated machines to manufacture a package of screws ‘A’, while it takes 6 minutes on the automatic and 3 minutes on the hand - operated machine to manufacture a package of screws ‘B’. Each machine is available for at most 4 hours on any day. The manufacturer can sell a package of screws ‘A’ at a profit of 70 P and screws ‘B’ at a profit of ₹ 1. Assuming that he can sell all the screws he can manufacture, how many packages of each type should the factory owner produce in a day in order to maximize his profit? Determine the maximum profit.

Let the factory manufacture x screws of type A and y screws of type B on each day,


Therefore, x 0 and y 0.


The given information can be compiled in a table as follows



4x + 6y 240


6x + 3y 240


The manufacturer can sell a package of screws ‘A’ at a profit of Rs 0.7 and screws ‘B’ at a profit of Re 1.


Total profit, Z = 0.7x + 1y


The mathematical formulation of the given problem is


Maximize Z = 0.7x + 1y


subject to the constraints,


4x + 6y 240


6x + 3y 240


x, y 0


First we will convert the inequations into equations as follows:


4x + 6y = 240, 6x + 3y = 240, x = 0, y = 0.


Region represented by 4x + 6y 240


The line 4x + 6y = 240 meets the coordinate axes at A(60,0) and B(0,40) respectively. By joining these points we obtain the line 4x + 6y = 240. Clearly (0, 0) satisfies the 4x + 6y 240. So, the region which contains the origin represents the solution set of the inequation 4x + 6y 240.


Region represented by 6x + 3y 240


The line 6x + 3y = 240 meets the coordinate axes at C(40,0) and d(0,80) respectively. By joining these points we obtain the line 6x + 3y = 240. Clearly (0, 0) satisfies the 6x + 3y 240. So, the region which contains the origin represents the solution set of the inequation 6x + 3y 240.


Region represented by x 0, y 0 :


Since, every point in the first quadrant satisfies these inequations. So, the first quadrant is the region represented by the inequations x 0 and y 0.


The feasible region determined by the system of constraints 4x + 6y 240, 6x + 3y 240, x 0,


y 0 are as follows.


4.jpg


The corner points are C(40,0), E(30,20), B(0,40). The values of Z at these corner points are as follows



The maximum value of Z is 410 at (30, 20).


Thus, the factory should produce 30 packages of screws A and 20 packages of screws b to get the maximum profit of Rs 410.

More from this chapter

All 20 →
10

Solve each of the following linear programming problems by graphical method.

Maximize Z = 50x + 30y


Subject to :


2x + y ≤ 18


3x + 2y ≤ 34


x, y ≥ 0

11

If a young man drives his scooter at a speed of 25 km/hr, he has to spend Rs2 per km on petrol. If he drives the scooter at a speed of 40 km/hour, it produces air pollution and increases his expenditure on petrol to Rs 5 per km. He has a maximum of Rs100 to spend on petrol and travel a maximum distance in one hour time with less pollution. Express this problem as an LPP and solve it graphically. What value do you find here?

13

A manufacturer makes two types A and B of tea - cups. Three machines are needed for the manufacture and the time in minutes required for each cup on the machines is given below :


Each machine is available for a maximum of 6 hours per day. If the profit on each cup A is 75 paise and that on each cup B is 50 paise, show that 15 tea - cups of type A and 30 of type B should be manufactured in a day to get the maximum profit.

14

A manufacturer produces two type of steel trunks. He has two machines A and B. For completing, the first types of the trunk requires 3 hours on machine A and 3 hours on machine B, whereas the second type of the trunk requires 3 hours on machine A and 2 hours on machine B . Machines A and B can work at most for 18 hours and 15 hours per day respectively. He earns a profit of Rs 30 and Rs 25 per trunk of the first type and the second type respectively. How many trunks of each type must
he make each day to make maximum profit?