Q6 of 118 Page 30

A company sells two different products A and B. The two products are produced in a common production process and are sold in two different markets. The production process has a total capacity of 45000 man - hours. It takes 5 hours to produce a unit of A and B hours to produce a unit of B. The market has been surveyed and company officials feel that the maximum number of units of A that can be sold is 7000 and that of B is 10, 000. If the profit is Rs 60 per unit for the product A and Rs 40 per unit for the product B, how many units of each product should be sold to maximize profit? Formulate the problem as LPP.


Let required production of product A be x units and production of product B be y units.


Given, profits on one unit of product A and B are Rs 60 and Rs 40 respectively, so profits on x units of product A and y units of product B are Rs 60x and Rs 40y.


Let Z be the total profit, so
Z = 60x + 40y


Given, production of one unit of product A and B require 5 hours and 3 hours respectively man hours, so x unit of product A and y units of product B require 5x hours and 3y hours of man hours respectively but total man hours available are 45000 hours, so


5x + 3y 45000 (First constraint)


Given, demand for product A is maximum 7000, so


x 7000 (Second constraint)


Hence, mathematical formulation of LPP:


Find x and y which


maximize Z = 60x + 40y


Subject to constraints,


5x + 3y 45000


x 7000


y 10000


x, y 0 [Since production cannot be less than zero]


More from this chapter

All 118 →
4

A firm manufactures two types of products A and B and sells them at a profit of Rs 2 on type A and Rs 3 on type B. Each product is processed on two machines M1 and M2. Type A requires one minute of processing time on M1 and two minutes of M2; type B requires one minute on M1 and one minute on M2. The machine M1 is available for not more than 6 hours 40 minutes while machine M2 is available for 10 hours during any working day. Formulate the problem as a LPP.

5

A rubber company is engaged in producing three types of tyres A, B and C. Each type requires processing in two plants, Plant I and Plant II. The capacities of the two plants, in the number of tyres per day, are as follows:


The monthly demand for tyre A, B and C is 2500, 3000 and 7000 respectively. If plant I costs Rs 2500 per day, and plant II costs Rs 3500 per day to operate, how many days should each be run per month to minimize cost while meeting the demand? Formulate the problem as LPP.

7

To maintain his health a person must fulfil certain minimum daily requirements for several kinds of nutrients. Assuming that there are only three kinds of nutrients – calcium, protein and calories and the person’s diet consists of only two food items, I and II, whose price and nutrient contents are shown in the table below:


What combination of two food items will satisfy the daily requirement and entail the least cost? Formulate this as a LPP.

8

A manufacturer can produce two products, A and B, during a given time period. Each of these products requires four different manufacturing operations: grinding, turning, assembling and testing. The manufacturing requirements in hours per unit of products A and B are given below.


The available capacities of these operations in hours for the given time period are: grinding 30; turning 60, assembling 200; testing 200. The contribution to profit is Rs 20 for each unit of A and Rs 30 for each unit of B. The firm can sell all that it produces at the prevailing market price. Determine the optimum amount of A and B to produce during the given time period. Formulate this as a LPP.